Alex Hernandez is Founder and CEO of PowerBridge, a company developing powered data center campuses, beginning in West Texas. PowerBridge is backed by Five Point Infrastructure with up to $1 billion of capital.
Alex previously founded and led Cumulus Data, which developed the first hyperscale data center campus directly connected to carbon-free nuclear power. The Pennsylvania campus was later acquired by Amazon Web Services in March 2024. Concurrently, from 2016 to 2023, Alex served as CEO of Talen Energy, a leading power generation company.
Earlier roles include CFO of TerraForm Power and Managing Director at Goldman Sachs. He previously served on the board of ERCOT and currently serves on the board of Target Hospitality.
What technology breakthrough would pave the way for the ICT industry?
AH: A defining breakthrough for the ICT industry will be the ability to fully integrate large-scale energy generation with digital infrastructure in a coordinated, deployment-ready model. As AI adoption accelerates, one of the primary constraints is access to reliable, scalable power delivered on predictable timelines. Advances in modular, dispatchable generation, combined with co-located infrastructure development that reduces reliance on traditional transmission buildouts, will fundamentally reshape how capacity is delivered. This approach enables purpose-built campuses where energy and compute are treated as a single system rather than separate dependencies. By aligning generation, interconnection, and site readiness from the outset, the industry can move beyond reactive, grid-constrained development and toward proactive, multi-gigawatt scalability. This breakthrough will unlock the speed, density, and certainty required to support the next phase of hyperscale and AI infrastructure growth.
If one thing should be redeveloped within the telecom and related industries, what should it be?
AH: The industry needs to rethink how and where data center infrastructure is developed to reflect the realities of today’s demand environment. For decades, data center development has followed available grid capacity, resulting in constrained growth, unpredictable timelines, and increasing competition for limited power resources. This reactive model is no longer sufficient for hyperscale and AI-driven workloads, which require certainty, speed, and the ability to scale rapidly.
A more effective approach is to plan and develop infrastructure holistically, integrating power generation, transmission, land, water, and connectivity into a single, coordinated platform from day one. By prioritizing energy availability as a foundational design principle rather than a limiting factor, developers can create fully prepared, execution-ready campuses. This shift not only accelerates deployment timelines but also redefines how operators evaluate sites, partners, and long-term capacity strategies in an increasingly power-constrained world.
What network-related development will have the greatest impact in our industry?
AH: The most impactful network development will be the expansion of diversified, long-haul fiber infrastructure that enables emerging regions to function as fully connected, hyperscale-ready markets. Historically, many energy-rich regions have been limited by insufficient or non-redundant connectivity, restricting the types of workloads they can support and increasing the risk of stranded infrastructure investment. By designing and deploying multiple, geographically diverse fiber routes, the industry can introduce true redundancy, create more direct network paths, and enable a broader mix of hyperscale and AI workloads.
This shift transforms isolated locations into nationally relevant points of presence within the broader network ecosystem. As digital infrastructure expands into new geographies, fiber will increasingly determine whether energy-advantaged locations can support the reliability and performance requirements of large-scale computing. Building that connectivity alongside new capacity can open markets that historically would not have been viable for hyperscale development.
What value does PTC hold for you/your company?
AH: PTC provides meaningful value as a platform for cross-industry collaboration at a time when alignment between sectors is more critical than ever. The challenges facing digital infrastructure cannot be solved in isolation, particularly around power availability, network scalability, and deployment timelines. PTC brings together key stakeholders across telecommunications and the broader digital infrastructure ecosystem, creating opportunities to align on priorities, share insights, and accelerate solutions.
For PowerBridge, the value is the opportunity to engage directly with the companies and leaders influencing where digital infrastructure is headed. PTC creates a forum for exchanging perspectives, developing relationships, and better understanding the connectivity requirements shaping future capacity needs. Those conversations are particularly valuable as the industry expands into new markets, and infrastructure decisions increasingly require coordination across multiple sectors.
How does PTC fit your company’s goals or career purpose?
AH: PTC aligns closely with PowerBridge’s goal of expanding the infrastructure available to support the next generation of digital demand. As hyperscale and AI development moves into new markets, relationships across the telecommunications and digital infrastructure communities become increasingly important.
PTC provides access to the network operators, hyperscalers and other industry stakeholders whose perspectives help inform where capacity is needed and how those markets are evolving. For PowerBridge, participating in that community creates opportunities to build relationships, exchange knowledge and better understand the requirements of companies deploying infrastructure at a significant scale. That engagement complements PowerBridge’s focus on opening new markets for digital development and providing customers with greater certainty around future capacity.
Describe why your company became a PTC Member, and the benefits/value you or your organization received since being a member:
AH: PowerBridge became a PTC Member to engage directly with the stakeholders shaping the future of digital infrastructure, particularly as energy, connectivity, and compute become increasingly interdependent. PTC brings together network operators, hyperscalers, infrastructure providers, and other industry leaders whose decisions are influencing the next generation of digital development. As a member, we value the opportunity to exchange perspectives, strengthen relationships, and participate in conversations about how and where future capacity will be delivered. For PowerBridge, that access to the broader PTC community complements our work developing the infrastructure required to support continued digital growth.
What advice would you share with current and future graduates interested in this field?
AH: Focus on understanding how systems connect, not just how individual technologies work. The future of digital infrastructure is no longer defined by isolated disciplines like networking, power, or real estate; it is shaped by how these elements are integrated into cohesive, scalable platforms. Graduates entering the field should prioritize learning across domains, particularly where energy and digital infrastructure intersect, as this is where the most significant constraints and opportunities exist. Equally important is developing a bias toward execution. The industry is increasingly rewarding those who can move from concept to delivery with certainty, especially in environments where timelines and capacity demands are accelerating. Seek opportunities to work on projects that require coordination across multiple stakeholders and long-term planning. Those who can bridge technical knowledge with practical implementation will be best positioned to lead as the industry evolves.
What has been a positive outcome organizationally or individually given the current state of the world?
AH: One of the most positive outcomes has been a shift toward greater discipline, alignment, and execution across the industry. As global demand for AI and digital infrastructure has accelerated, organizations have been forced to move beyond conceptual planning toward tangible solutions. This has elevated the importance of early decision-making, long-lead procurement, and greater coordination among teams and partners.
For PowerBridge, that environment has reinforced the importance of making decisions early, taking accountability for outcomes, and maintaining a clear focus on what can actually be delivered. It has also encouraged broader collaboration among industries that historically operated more independently. Individually, leaders are being challenged to understand issues beyond their traditional areas of expertise and make decisions with a more complete view of the infrastructure required. That increased discipline and collaboration is a positive development for an industry being asked to deliver unprecedented capacity on increasingly compressed timelines.
About PowerBridge
PowerBridge develops and delivers gigawatt-scale powered campuses by integrating power generation, land, water, and fiber infrastructure into a single, execution-ready platform throughout North America. PowerBridge is energizing the digital era.